Most first-time builders budget for the visible parts of a house: walls, roof, tiles and paint. The costs that derail projects are usually the invisible ones: ground conditions, services, external works and the cost of changes.
Start with the ground
A soil test is inexpensive compared with discovering rock, black cotton soil or a high water table after excavation. Ground conditions can change your foundation design and your budget by a significant margin. Budget for a test before you finalise drawings.
Include the external works
Boundary walls, gates, drainage, paving, landscaping, water storage and a septic tank or sewer connection are all part of a functioning home. On many projects these add 10–20% to the build cost, and they are routinely left out of first estimates.
Price the finishes properly
- Floor tiles: allow for wastage of 8–10%.
- Kitchen and wardrobes: joinery is often underestimated.
- Windows and doors: steel, aluminium and timber vary widely.
- Electrical and plumbing: allow for quality fittings, not just conduit.
Hold a contingency
A contingency of 10% is not pessimism, it is standard practice. It covers design development, price movement and the small discoveries that every site produces. If you do not use it, you have a buffer at handover.
A budget is not a single number. It is a plan for what you will spend, when, and what you will do if something changes.
Get a measured estimate
A measured estimate based on drawings and a site visit will always beat a rate per square metre. Use our online estimator for an indicative range, then ask us for a measured quote before you commit.